Thameslink: Structural Steel – London Bridge

Summary

With the steelwork being on the London Bridge project’s critical path, any problems encountered by Bourne Group had a knock-on impact to the rest of the programme, so it was important to keep whole project team happy.

Structural steelwork at London Bridge station included:

- Temporary platform canopies.
- Structural steel in for the retail and ticket office concourse units.

Full resource

This resource is hosted on an external website.

Read the full resource

Leave a comment

You must be logged in to post a comment.